Case Studies ~ Pedestrian Barrier to public footpath

View Larger Image
« »

Pedestrian Barrier to public footpath

Type: Structural Steelwork
Completed: Sunday, 4th November 2007

Details:

Fabrication and installation of a metal pedestrian barrier.

Caldyne are to fabricate and install a galvanised metal pedestrian control barrier which includes structural steel beams bolted to concrete foundations. The works are located at the Crossness Sewerage Treatment works in Erith, near Dartford and is to control pedestrian movement at a footpath.